Pre-Mission Worksheet
Instructionsβ
Responsibility: Cybercrew Lead
Prior to mission execution (post-mission planning):
- Retrieve crew-member scores for Personal ORM Worksheet A and Personal ORM Worksheet B
- Assess sortie risk factor scores using this worksheet
- For each HIGH and SEVERE risk factor:
- Document the control(s) you will implement to mitigate or monitor the risk
- Post-sortie execution, evaluate the success of the implemented control(s)
- Calculate the total worksheet score and use the Mission Risk Acceptance table to identify the overall risk level
- Notify the appropriate authorities of overall mission risk per the Mission Risk Acceptance table (brief the HIGH/SEVERE risk factors)
- Obtain overall risk acceptance and mission execution approval from the appropriate authorities per the Mission Risk Acceptance table (brief the HIGH/SEVERE risk factors)
note
Typically all risk factors are included in the Pre-Mission Brief, but at a minimum - all HIGH and SEVERE risk factors and mitigation controls must be included.
Mission Risk Factorsβ
| General Risk Factors | Risk Factor Point Scale | Actions Required @ SEVERE | |||
| 0 - (LOW) Green | 1 - (MODERATE) Yellow | 2 - (HIGH) Orange | 3 - (SEVERE) Red | ||
| MISSION PARTICIPATING FORCES RISKS | |||||
| 1 Other DCO Forces (Excluding Mission Partners and CSSPs) |
|
|
|
|
|
| TIMELINE RISKS | |||||
| 2 Mission Planning |
|
|
|
| |
| PHYSICAL ENVIRONMENT RISKS | |||||
| 3 Location of Personnel |
|
| |||
| 4 Duration of Presence (OCONUS Only) |
|
| |||
| 5 Remote Operations |
|
| |||
| 6 Local Physical Threats |
|
|
|
|
|
| 7 Local Foreign Intelligence Threats |
|
|
|
|
|
| NETWORK ENVIRONMENT RISKS | |||||
| 8 Complexity |
|
|
|
|
|
| 9 Environment Situational Awareness |
|
| |||
| 10 Network/System Criticality to Mission Owner |
|
|
|
| |
| EQUIPMENT RISKS | |||||
| 11 Suitability |
|
|
| ||
| 12 Version |
|
| |||
| NETWORK SENSOR INTEGRATION RISKS | |||||
| 13 Sensor Installation |
|
|
|
| |
| 14 Sensor Posture |
|
| |||
| HOST INTERACTION RISKS | |||||
| 15 Agent Installation |
|
|
|
|
|
| 16 Agent Posture |
|
| |||
| 17 Planned Interaction Methods |
|
|
| ||
| OTHER RISKS | |||||
| 18 Any other noteworthy risks identified not otherwise captured in this document. Note situation, and level of risk | Note: Justification of score required | ||||
Mission Risk Acceptanceβ
| RISK LEVEL (Total Worksheet Score) | REQUIRED APPROVALS | REQUIRED NOTIFICATIONS |
|---|---|---|
| 0-10 (LOW) |
|
|
| 11-25 (MODERATE) |
|
|
| 26-50 (HIGH) |
|
|
| β₯ 51 (SEVERE) |
|
|